Home › Builder or installer

Start here: builders and installers

In short

  • New discharges since 2 October 2023 face extra rules, including the 50-metre rule.
  • Septic tanks need a drainage field to BS 6297, sized from a percolation test.
  • We can check your plans against the published rules before you dig.

Free builder tools

Big buttons, pictures, no jargon. Each works on your phone on site.

The rules, step by step

  1. 1. The rules, in plain EnglishGround vs surface water, the dates, and the extra rules for new discharges.
  2. 2. Drainage fields and percolation testsWhat Approved Document H asks for, and siting distances.
  3. 3. Septic tank or treatment plant?Which can go where.
  4. 4. Quick rules check for a plotRun a site through the general binding rules.