Drainage fall calculator
In short
- Tell it what the pipe carries, the pipe size and the run.
- It shows the fall (1 in X), the drop per metre and the total drop.
- Then it checks it against the minimum gradients in Approved Document H.
Drop per metre at common gradients
| Gradient | Drop per 1m | Drop over 10m |
|---|---|---|
| 1 in 40 | 25mm | 250mm |
| 1 in 50 | 20mm | 200mm |
| 1 in 60 | 16.7mm | 167mm |
| 1 in 80 | 12.5mm | 125mm |
| 1 in 100 | 10mm | 100mm |
| 1 in 150 | 6.7mm | 67mm |
| 1 in 200 | 5mm | 50mm |
Drop per metre = 1,000 ÷ X for a gradient of 1 in X.
Where the minimums come from
- Approved Document H1, Table 6 (foul drains): under 1 litre a second, 75mm and 100mm at 1:40; over 1 litre a second, 75mm at 1:80, 100mm at 1:80 (at least 1 WC) and 150mm at 1:150 (at least 5 WCs).
- H1 paragraph 2.33: a foul drain should be at least 75mm; a drain taking a WC at least 100mm. Paragraph 2.19: lay pipes to even gradients.
- H3 paragraph 3.15 (rainwater drains): 75mm and 100mm not flatter than 1:100; 150mm not flatter than 1:150.
- H2 paragraph 1.40: drainage field pipes at a uniform gradient no steeper than 1:200. H2 paragraph 1.22: the last 12m into a septic tank can be laid at 1 in 50 or flatter to slow the flow.