Soakaway size: rough guide
In short
- Pick the roof or paved area and type in its size.
- It works out how much rain the soakaway has to hold in a heavy storm.
- It is an estimate. You still need a percolation test, and bigger areas need a proper design.
Before you dig
- Do a percolation test first. If water doesn't soak away, a soakaway won't work.
- Not within 5m of a building or road, not where the water table reaches the bottom, and not where it could pollute groundwater (H3 3.25).
- Never send rainwater to a septic tank or cesspit (H3 0.6). See soakaways vs drainage fields.
How this estimate works
- Effective area: Approved Document H3, Table 1. Flat roofs and paving use the plan area; pitched roofs use plan area × 1.29 (30°), × 1.50 (45°) or × 1.87 (60°).
- Water to hold = effective area × storm rainfall. H3 paragraph 3.27: design for a 1-in-10-year storm; for 25m² or less, 10mm in 5 minutes may be assumed.
- H3 paragraphs 3.27 to 3.30: for bigger areas, design to BS EN 752-4 or BRE Digest 365, which use local rainfall and your percolation result. That proper design can come out bigger or smaller than this.
- This guide ignores any water soaking away during the storm, so it leans to the safe side for small areas.
Guide only, not a certified design. Figures from Approved Document H (2015 edition). Building control, or your designer, has the final say. Nothing you type here is sent anywhere.