Percolation test and drainage field calculator
In short
- Type in how long the water took to drop in each test hole.
- It works out the Vp figure, tells you if a drainage field can work, and how big it needs to be.
- Uses the method and formula in Approved Document H2 for septic tanks.
Where it can go (H2 1.27)
- At least 15m from any building.
- At least 10m from any watercourse or permeable drain.
- At least 50m from a borehole, well or spring used for water, and not in a Zone 1 groundwater protection zone.
- Also check the general binding rules and our rules checker.
Where this comes from
- Approved Document H2 paragraphs 1.34 to 1.37: the test hole, the overnight soak, timing the drop from 75% to 25% full, and Vp = time in seconds ÷ 150. Take the average of at least 3 tests.
- Paragraph 1.38: a drainage field should only be used when the average Vp is between 12 and 100.
- Paragraph 1.44: floor area of the trenches, At (m²) = number of people × Vp × 0.25. Trench length = floor area ÷ trench width.
- Paragraphs 1.40 to 1.43: trench width 300 to 900mm, 2m between trenches, pipe at least 500mm deep, laid no steeper than 1 in 200, inspection chamber between tank and field.
- This formula is for septic tank effluent. Treatment plants are sized differently (see BS 6297): ask the plant maker or your designer.
Guide only, not a certified design. Figures from Approved Document H (2015 edition). Building control, or your designer, has the final say. Nothing you type here is sent anywhere.